Off the Plan Potential Problem #50: Unforeseen Maintenance

Can a new off-the-plan property have unexpected maintenance costs?

Yes. New properties still require routine servicing, and construction defects can create additional repair costs soon after completion. NSW buyers should check building quality, maintenance budgets and available legal protections before committing. A new appearance, occupation certificate or developer’s promise does not guarantee that every future repair will be covered.

Leaks, drainage problems, faulty installations and inadequate ventilation can affect both individual homes and shared building areas. The financial impact may include inspections, temporary protection and strata levies while responsibility is investigated.

The useful starting point is to identify what failed, why it failed and who is legally responsible. Paying for an urgent repair and ultimately recovering that expense are separate questions.

How is ordinary maintenance different from a building defect?

Maintenance keeps a building functioning through cleaning, servicing and replacing worn components. A defect may arise from deficient design, materials or workmanship, or non-compliance with applicable requirements. Similar symptoms can have different causes, so an independent assessment is often necessary before accepting that an expensive problem is simply the owner’s responsibility.

For example, clearing a blocked gutter may be routine maintenance; water entering through incorrectly installed waterproofing may indicate defective work. Condensation and mould require investigation rather than an assumption about ventilation or occupant behaviour.

Ask an appropriately qualified inspector or engineer to identify the cause, necessary work and urgency. A standard visual inspection has limits: concealed waterproofing and shared services may need specialist investigation.

What does the Bathla Group example show buyers?

The Bathla Group example highlights the need to examine both a development’s condition and the responsible company’s capacity to complete or repair it. Published regulatory orders concern particular buildings and entities. They do not establish that every Bathla property is defective, and an order requiring repairs does not guarantee compensation.

On 3 September 2026, Building Commission NSW issued a building work rectification order to Universal Property Group Pty Limited for 141 Darkes Road, Kembla Grange. It identified serious defects, including basement waterproofing issues, and required remediation within eight months. A separate prohibition order prohibited an occupation certificate until that prohibition order was revoked.

Teneo’s creditor portal confirms that administrators were appointed on 25 August 2026 to Universal Property Group, Raj & Jai Construction and associated Bathla companies. In its August announcement, Bathla described administration as a pathway to restructuring and supporting project completion.

These are dated regulatory and administration records, not a court judgment awarding purchasers damages. Buyers should obtain the latest position for their particular project and contracting entity, including any variation or revocation of orders.

The practical lesson is to check whether a promised repair has a documented scope, accountable contractor and realistic funding source.

Who pays for repairs in a new strata building?

The owners corporation generally maintains and repairs common property, including addressing defects, while individual owners maintain their lot property. The strata plan and by-laws help determine responsibility. A claim against a builder or developer may be available, but the building can still need immediate funding while that claim is pursued.

Under section 106 of the Strata Schemes Management Act 2015, the owners corporation has common-property maintenance obligations. Owners should report problems to the strata manager or committee and request a documented response.

Where existing funds are insufficient, owners may face a special levy. Ask whether proposed expenditure covers investigation, temporary works or permanent rectification, and how any recovery claim will be managed. Our strata purchase guidance explains the importance of reviewing the scheme’s records.

What statutory warranty periods apply to defective work?

Statutory warranty proceedings generally must begin within six years for a breach resulting in a major defect and two years for other defects, calculated from completion of the relevant work. A further six months may apply if the breach becomes apparent in the final six months of the applicable period.

A defect is not legally “major” simply because the repair is expensive. Its classification and the completion date require careful assessment. These periods are not automatically measured from when you bought or moved into the property.

Have a lawyer identify the claimant, responsible parties and deadline early. A developer’s contractual defects period does not replace statutory rights, and ongoing negotiations or a regulatory complaint should not be assumed to preserve the time for commencing proceedings.

Will insurance or a strata building bond cover every repair?

No. Home Building Compensation cover depends on the policy, the work and an insured trigger, such as the builder’s insolvency. Many new apartment buildings are exempt from mandatory cover. A strata building bond can fund qualifying defect rectification, but neither protection should be treated as unlimited insurance against maintenance costs.

New multi-unit buildings with a rise in storeys of more than three are exempt from mandatory HBC cover. Where cover exists, qualifying triggers include death, insolvency, disappearance or licence suspension for failure to comply with a money order in the claimant’s favour. Notify the insurer promptly in writing, even while the builder is trading.

For eligible strata developments, the building bond is currently 2% of the construction contract price. The increase to 3% has been deferred to 1 July 2028. The scheme uses inspections to identify defective work; buyers should confirm its application, deadlines and available amount.

How can buyers test whether proposed strata levies are realistic?

Compare proposed levies with the initial maintenance schedule, service contracts and capital works planning. Low advertised levies may leave little allowance for ongoing servicing or replacement. NSW’s April 2026 reforms strengthen maintenance documentation and independent review of initial estimates for new multi-storey schemes, but purchasers should still examine the underlying assumptions.

From 1 April 2026, initial maintenance schedules must use the standard form. For new multi-storey schemes, an independent qualified surveyor must review and certify the schedule’s compliance with that form and the initial levy estimates against expected first-year expenditure. Evidence must reach the owners corporation at least 14 days before its first annual general meeting.

Check allowances for lifts, fire systems, pumps, waterproofing inspections and other shared equipment. A capital works plan should address longer-term replacement, not merely the first year’s bills.

What should I check before signing and before settlement?

Have a lawyer review the contract before signing and arrange an independent inspection when the property is ready and access is available. Check the exact developer and builder entities, published orders, applicable insurance and the proposed maintenance arrangements. Record defects and promised remedies in writing before making decisions about settlement.

  • Review inspection rights, defect notification requirements and the contractual process for rectification.
  • Check available strata records, budgets, by-laws and common-property reports.
  • Obtain relevant certificates, warranties, operating manuals and servicing requirements.
  • Ask your lawyer whether identified problems create any right to delay settlement, require rectification or pursue another remedy.

Do not simply withhold settlement funds or assume every defect permits termination. The contract and facts determine the available response.

What should owners do when problems appear after moving in?

Document the problem promptly, address immediate safety risks and notify the responsible parties in writing. Obtain an assessment proportionate to the issue and preserve evidence of costs and damage. Coordinate common-property concerns through the owners corporation, while a lawyer checks complaint options, insurance requirements and any approaching deadline for proceedings.

Keep dated photographs, inspection reports, invoices and correspondence. Where emergency work is necessary, record conditions before repairs where safe and retain evidence of why the work was needed.

Building Commission NSW can assist with eligible disputes. NCAT has referral requirements and jurisdictional limits, with exceptions relevant to urgent filing deadlines; do not wait for negotiations to finish if rights may expire.

CM Lawyers can review your off-the-plan purchase and advise on the legal issues raised by maintenance or defects. Contact our team with the contract, reports and correspondence.